|
|
|
|

Operational Permits

Amusement Building

Special Amusement Building operational permit is required due to the safety concerns as they pertain to the ability of occupants to readily exit in the event of an emergency. Amusement building operational permits shall be renewed annually or if the pathway or movement through the building changes. Special Amusement Building is defined by the adopted code as, a building that is temporary, permanent or mobile that contains a device or system that conveys passengers or provides a walkway along, around or over a course in any direction as a form of amusement arranged so that the egress path is not readily apparent due to visual or audio distractions or an intentionally confounded egress path, or is not readily available because of the mode of conveyance through the building or structure.


APPLY NOW
Download Standard